Client: Preferred Sands
Project: Design and build a Resin Plant for the FRAC sand industry
Services provided: Industrial Construction Services, Fabrication, Erection, Project Management, Rigging
Industry: Oil and Natural Gas
Project turnaround: 8 months
JGM supplied all of the management, supervision; labor and equipment to design-build a new resin coating plant for the FRAC sand industry. The design team worked 7 days a week to keep up with the changes as we continued to build and integrate this new plant into the existing FRAC sand plant. As the natural gas market continued to explode it was important that we keep the schedule so that this client could be first to market with this new innovative product. At the peak of this project we had over 100 men working this site 7 days a week 12 hours days. Everything form steel erection & siding install, to equipment setting and start up was taking place simultaneously on this project. Logistics had to be just right for us to hit the deadline. JGM supplied a safety consultant to review the jobsite in addition to our full time safety supervises. When a job is moving this fast we felt it was necessary to have a secondary set of eyes of the overall project. We completed this project ahead of schedule and with zero incidences.
Testimonial:
“Joe and JGM have been doing work for Preferred for years. JGM always brings a ‘jump through hoops for the client’ mentality that has kept them as our ‘go-to’ fabricator, rigger, and millwright. Small enough to be nimble to meet our aggressive time frames, but professional enough to complete our projects on time, within our budget requirements, and most importantly safely.”
–Kevin Traynor, Executive Vice President & Partner, Preferred Sands, Radnor, Pa.