Client: Preferred Sands
Project: Provided all equipment and a certified rigger to offload a 35,000 lb. sand heater
Services provided: Rigging and project management
Industry: Mining
Project turnaround: 1 day
JGM was asked to offload a 35,000 lb. sand heater at a remote mining site in northeastern Arizona. Our field crew mobilized on a Saturday afternoon and were standing by with a 150-ton crane and several light towers in order to make the pick. The truck finally pulled in around 8 p.m. and the unit was safely offloaded that night onto dunnage, ready for installation the following day.
Testimonial:
“Joe and JGM have been doing work for Preferred for years. JGM always brings a ‘jump through hoops for the client’ mentality that has kept them as our ‘go-to’ fabricator, rigger, and millwright. Small enough to be nimble to meet our aggressive time frames, but professional enough to complete our projects on time, within our budget requirements, and most importantly safely.”
–Kevin Traynor, Executive Vice President & Partner, Preferred Sands, Radnor, Pa.