Consolidated North Warehouse- Aberdeen, Md.

Client: James G. Davis Construction
Project: 145,000 sq. ft. warehouse on the Aberdeen Proving Grounds
Services provided: Structural steel fabrication and installation
Industry: Government
Project turnaround: 60 days

This project had an aggressive schedule that required 700 tons of structural steel to be erected in just 60 days. Utilizing 3D BIM modeling, two 110-ton crawler cranes, and approximately 35 field workers, JGM was able to complete the job on time with no injuries.

Testimonial:
“JGM’s team was very professional and cooperative in their dealings with the USACE project team. As issues arose in the field, they were willing to proactively suggest solutions that kept the project moving forward. They considered themselves part of the team to deliver a successful project, and that was evident in their attitude and approach to the project.”

–John M. Fink, Resident Engineer, Department of the Army, Washington Loop, APG, Md.