Client: Penntex Construction Company
Project: 250,000 sq. ft. mezzanine
Services provided: Design and engineering, steel fabrication, and installation
Industry: Commercial
Project turnaround: 45 days
From initial contact, JGM pulled together a design-build budget and a conceptual design in 24 hours and was awarded the project 36 hours later. We mobilized that day and worked simultaneously with three detailing companies, three fabricators, and two erectors. JGM completed the 250,000 sq. ft. mezzanine with 750 tons of steel and 5,000 lineal feet of two-line pipe railing, powder-coated safety yellow, along with ten sets of diamond plate stairs within the 45-day deadline.
Testimonial:
“Having invited several contractors to provide rapid-turnaround for costing, engineering, fabrication and erection, JGM was significantly more efficient than the others, responding with engineered drawings and competitive pricing within days. We are pleased to say the columns, beams, and decking were procured, fabricated and efficiently installed in such a manner that we were able to meet or exceed our scheduled milestone dates.”
–Dwight A. Lewis, Senior Project Manager, Penntex Construction Company, Blue Bell, Pa.